• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to secondary sidebar
  • NEWS:
  • SatNews
  • SatMagazine
  • MilSatMagazine
  • SmallSat News
  • |     EVENTS:
  • SmallSat Symposium
  • Satellite Innovation
  • MilSat Symposium

SatNews

  • HOME
  • Magazines
  • Events
  • SmallSat Europe Insights
  • Industry Calendar
    • IN PERSON
    • VIRTUAL
  • Subscribe

Lockheed Martin: Smallsat rapid development facility opens + also completes the CDR for SDA Tranche 1 Transport Layer satellites

August 7, 2023

Lockheed Martin’s Waterton campus in Colorado.

Lockheed Martin (NYSE: LMT) has opened a facility that streamlines small satellite (smallsat) processing to enable high-rate delivery.

The multi-million dollar facility will house the company’s Space Development Agency (SDA) Tranche 1 Transport Layer satellites, among other smallsat programs and technology demonstrators.

The 20,000-square-foot, low bay clean room, located on the company’s Waterton campus, will feature six, scalable, parallel assembly lines and is configurable to host different classifications of missions concurrently. Built with flow and throughput in mind, the center is tailored to accommodate all stages of smallsat development, including spacecraft-level functional and performance testing.

The facility hosts dedicated testing capabilities, including thermal cycle and electromagnetic chambers, scaled to efficiently build and test satellites ranging in size from CubeSats to smallsats. The tailored fit reduces waste and optimizes energy and space, supporting the delivery of 180 satellites or more per year.

Lockheed Martin is currently developing more than 50 satellites for the SDA’s Transport Layer, which will provide military users with low-latency communication links through a resilient network of integrated capabilities from LEO. Lockheed Martin’s 10, Tranche 0 Transport Layer satellites are expected to launch this year, while its 42, Tranche 1 satellites will soon move into processing in the new factory to support a 2024 launch.

“Lockheed Martin is committed to providing advanced satellites of different sizes and capabilities to meet our customers’ needs and support their strategy to achieve greater orbital diversity,” said . “This new facility is one of many investments our company has made to lower costs and to deliver scalable solutions with increased speed and agility, to provide 21st Century Security solutions for our customers.” — Johnathon Caldwell, Vice President and General Manager, Military Space, Lockheed Martin

Lockheed Martin completes CDR for the SDA’s Tranche 1 Transport Layer Satellites

Lockheed Martin’s Tranche 0 Transport Layer satellites are seen in one of its processing facilities

Lockheed Martin’s Tranche 0 Transport Layer satellites are seen in one of the company’s processing facilities.

Lockheed Martin (NYSE: LMT) and the Space Development Agency (SDA) have also successfully completed the Critical Design Review (CDR) for SDA’s Tranche 1 Transport Layer (T1TL) program. The integrated system review validated that Lockheed Martin’s T1TL ground and space designs meet all mission requirements and can proceed to production. 

The initial warfighting capability of the SDA’s Proliferated Warfighter Space Architecture (PWSA), T1TL consists of 126 space vehicles divided into six orbital planes. Lockheed Martin is building 42 of those space vehicles for the transport layer constellation, which will provide assured, resilient, low-latency military data and connectivity worldwide to a full range of warfighter platforms using Link-16 waveforms and laser optical intersatellite links.

During the CDR, which took place eight months after a successful preliminary design review, Lockheed Martin and SDA worked closely to thoroughly validate the company’s T1TL satellite and ground designs, to include supplier designs. The CDR included various design validation tests and a successful system optical communications terminal interoperability test, in addition to many other analyses.

For additional risk mitigation, Lockheed Martin 3D-printed a full-size replica of the Tranche 1 satellite vehicle testbed during the CDR to optimize assembly, integration and testing.

With the completion of CDR, Lockheed Martin now begins the integration and testing phase of the program, which will use the company’s new, 20,000-square-foot small satellite processing facility that is designed for high-rate delivery, hosts dedicated test chambers, and can simultaneously accommodate multiple classes of missions. T1TL will be the first program to be hosted by the new facility, which helps transform our business operations to meet our customer’s needs with speed and agility.   

SDA also contracted Lockheed Martin to build 10, Tranche 0 Transport Layer (T0TL) satellites, which are ready for launch this summer. SDA’s T0TL constellation serves as the first step toward building an interoperable, connected secure mesh network to support Joint All-Domain Operations.

“Between SDA’s critical support and engagement and Lockheed Martin’s lessons learned from our work on Transport Layer Tranche 0, we were able to achieve a precise review with successful results” said . “The strength of our relationships and thoroughness of the review positions Lockheed Martin to deliver the T1TL satellites on time for SDA’s 2024 launch.” — Chris Winslett, Lockheed Martin’s Director for the SDA Transport Layer programs

Filed Under: 3D Printing, Agencies, Constellations, Critical Design Review (CDR), Facility, Ground Designs, Laser Optical Intersatellite Links, LEO, Link-16, Lockheed Martin, Lockheed Martin Military Space, Mesh Network, Military, Military Space, Production Facility, Proliferated Warfighter Space Architecture (PWSA), SmallSat, smallsats, Space Development Agency (SDA), Testing + Verification, Testing Facilities, Tranche 0, Tranche 1 Transport Layer (T1TL), Warfighter Platforms, Waveforms Tagged With: Featured

Primary Sidebar

Most Read Stories

  • Wishing Everyone a Happy July 4th … Independence Day, U.S.A.
  • Startical launches the firm's 2nd demo satellite — IOD-2
  • Rocket Lab launches ‘Symphony In The Stars’ and achieves new record of two launches under 48 hours
  • Forrester's Digest: AST SpaceMobile’s FM1 launch date slips
  • Could Amazon buy into AST SpaceMobile?

About Satnews

  • Contacts
  • History

Archives

  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020

Secondary Sidebar

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.
x
Sign up Now (For Free)
Access daily or weekly satellite news updates covering all aspects of the commercial and military satellite industry.
Invalid email address
Notify Me Regarding ( At least one ):
We value your privacy and will not sell or share your email or other information with any other company. You may also unsubscribe at anytime.

Click Here to see our full privacy policy.
Thanks for subscribing!